The Use Of Earned Value Management For Initiating Directive Project Control Decisions: A Case Study

Ntokozo H. Nkiwane, Werner G. Meyer & Herman Steyn

Abstract
With large infrastructure backlogs in Africa, well-controlled projects will play a significant role in African infrastructure development. In this paper, the monitoring and/or directive use of Earned Value Management (EVM) is investigated and linked to project management maturity. This case study also investigates the use of EVM based on the financial and schedule risk distribution among project role players, and the effect of EVM on project performance. The results show minimal use of EVM in the directive control of projects; at best, the directive use of EVM is found to be implied rather than deliberate and methodical.

Keywords: Earned Value Management (EVM); Construction Projects

http://sajie.journals.ac.za/pub/article/view/1260

Access the full paper here

Slide 1
Quick Links
Professional Recognition

The PPM is recognised by the following:

  1. PMI (Project Management Institute) – USA and Globally
  2. ECSA (Engineering Council of SA)
  3. SACPCMP (South African Council for the Project and Construction Management Professions)
  4. SACNASP (South African Council for Natural Scientific Professionals)
  5. PMSA (Project Management South Africa)

On successful completion of the PPM, suitable candidates may be eligible to apply for the professional designation of Project Manager (PM) conferred by Project Management South Africa (PMSA). PMSA is the SAQA recognized professional body representing the interests of project managers across sectors.

Contact Information

Tel no: +27 (0)12 434 2347
For enquiries, please use our contact form: Contact us

Copyright © 2026 University of Pretoria. All Rights Reserved.

Cookie policy

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.

Cookie Policy